Southeast stairwell window framing 12-01-2006 |

East side radious is covered for heat to prepare for Stuco 12-01-2006 |

Meatal support framing for the elevator 12-01-2006 |

Canvas to hold in heat for stucco work as seen from inside the second floor near elevator 12-01-2006 |

Education Center 12-01-2006 |

2nd floor hallway 12-01-2006 |

Mary Jensen's office on the left 12-01-2006 |

Under all that white material are warm workman completing stucco work! 12-01-2006 |

The entry area with glass in place 12-01-2006 |

Wet Stucco being applied under the white cover on the west side 12-01-2006 |

The elevator platform from the bottom 12-01-2006 |

The freeweight area. Note the elevator doorframes leaning on the wall in the foreground. They won't be there long. 12-01-2006 |

The wellness entry area from the freeweight area 12-01-2006 |

AEROBICS ROOM 12-01-2006 |

THERAPY DEPARTMENT RECEPTION AREA 12-01-2006 |

Thats Brenda B's office in the back left corner of the Therapy Department. 12-01-2006 |

Pipes and air ducts in therapy area 12-01-2006 |

Hallway 1st floor 12-01-2006 |

Elevator equipment room in basement 12-01-2006 |

Second floor hallway looking south 12-04-2006 |

West side of building - stucco on radius 12-04-2006 |

WEST SIDE 12-04-2006 |

Brick removal on north wall of pool room 12-04-2006 |

Second floor with Education Center on the right 12-04-2006 |

WEST SIDE 12-04-2006 |

Northwest corner with only one more coat needed on soffit 12-08-2006 |

LAUNDRY AREA - BASEMENT 12-08-2006 |

Hallway in basement with west wall and ceiling painted 12-08-2006 |

Materials Management storage area in basement - ceiling and walls painted 12-08-2006 |

Dry Wall taping on First Floor Hallway 12-08-2006 |

Chapman Wellness Center from First Floor Hallway 12-08-2006 |

New Therapy area taking shape 12-08-2006 |

Aaron Proctor's office, Director of Physical Therapy 12-08-2006 |

Brenda Bohnnenblust's office, Speech Therapy 12-08-2006 |

Office for Therapists 12-08-2006 |

Chapman Wellness Center looking towards the Therapy area 12-08-2006 |

Exercise room in Chapman Wellness Center looking south towards the pool area 12-08-2006 |

East wall of Aerobic room in Chapman Wellness Center 12-08-2006 |

Chapman Wellness center looking west from the free-weight area 12-08-2006 |

Chapman Wellness Center looking west from the free-weight area 12-08-2006 |

Chapman Wellness Center looking north 12-08-2006 |

Second floor hallway - support columns being enclosed 12-08-2006 |

South end of Education Center looking west 12-08-2006 |

Looking south in Administrative Hallway on second floor 12-08-2006 |

Looking across the atrium towards the Education Center 12-08-2006 |

Looking towards the elevator area from the Education Center 12-08-2006 |

West side of the two story addition 12-08-2006 |

Brick pillars outside entrance to Chapman Wellness Center 12-08-2006 |

Glass is complete in southeast stairwell 12-08-2006 |

12-13-2006 |

12-13-2006 |

12-13-2006 |

12-13-2006 |

12-13-2006 |

12-13-2006 |

Wellness Center 12-13-2006 |

Southeast corner of new addition 12-14-2006 |

Waiting area in Wellness Center 12-15-2006 |

12-15-2006 |

12-15-2006 |

12-15-2006 |

Entrance to new addition 12-15-2006 |

12-15-2006 |

12-18-2006 |

Future hallway into main hospital 12-18-2006 |

Elevator 12-18-2006 |

Future hallway on first floor into main hospital building 12-18-2006 |

Director's office in Wellness and Fitness Center 12-18-2006 |

12-18-2006 |

Hole in laundry room for ductwork 12-18-2006 |

Studs for sheetrock in hallway to eastwing basement 12-18-2006 |

Ductwork hole complete 12-18-2006 |

Dave Bloom's crew working on curbing for parking lot 12-18-2006 |

2nd Floor unassigned area has insulation complete 12-18-2006 |

Insulation around chase between Administrative work room 12-18-2006 |

Insulation on chase on 2nd floor 12-18-2006 |

12-18-2006 |

12-18-2006 |

12-18-2006 |

12-18-2006 |

First Floor Future Hall Through the Outside Wall Into the Main Building! 12-18-2006 |

Columns being stuccoed! 12-18-2006 |

12-18-2006 |

Beginning Of the Parking Lot! 12-18-2006 |

First Hallway Entrance to the Main Building 12-19-2006 |

Future Entry Area into the Chapman Wellness Center 12-19-2006 |

Laundry Room in the Basement_Large Ventilation Tube 12-19-2006 |

Installed ventilation connection to the dryers! 12-19-2006 |

Putting dry wall in the storage area on the second floor! 12-19-2006 |

Open elevator door on lst floor 12-19-2006 |